|
|
|
VS-PLUS Reference Installations
The following links will guide you to some reference
installations of VS-PLUS. All of the reference installations
have some particularities, like a great number of Public
Transit vehicles or railroad preemption.
To cope with these particularities is one of the strengths of
VS-PLUS.
|

|
Basle,
Switzerland |
- Bankverein (node 135)
- 4 arriving tram lines and 3 leaving tram lines
- Tram evaluation with bifurcation contact
(user-specific programming)
- 3 tram stop on the intersection, two of them
allowing two consecutive vehicles to stop
simultaneously
- Schützenhaus (node 145)
- 2 partial nodes
- Connected to the coordination of the middle ring
road „Mittlerer Ring“
- PT priority inside a car coordination
- Badischer Bahnhof (node 213)
- 2 coordinated partial nodes
- Tram loop over both partial nodes
- Priority to 6 PT lines in case of high individual
traffic flow
- Spalentor (node 780)
- PT priority in case of high car traffic flow or a
great number of pedestrians
- 3 stops just besides the intersection
- Emergency phases for firefighters and ambulances
from a nearby hospita
|

|
Berne,
Switzerland |
|

|
Lucerne,
Switzerland |
|

|
Solothurn,
Switzerland |
|

|
Contact |
Please use the contact
form if you wish to receive more information about the
reference projects of VS-PLUS. |
|
|
|
|
|
|
|